BLOCK PAVED DRIVEWAY

AFTER20141007_155746

This is the job complete, after we screeded the sand out we laid the new block paving, we then swept in the kiln dried sand to fill in all the gaps between the blocks, then used a whacker plater to get it nice and tight. We also installed a new picket fence along each side.

BEFORE

20141006_084826

This is how the job looked before we started, we had to remove the excisting tarmac and hardcore then install the new sub base.

Leave a Reply