TURFING AND DECKING PROJECT

AFTERslider-garden-1

This is the completed job, as you can see we installed the new decking onto the frame and got it nice and level from the back door so there wasn’t much of a step down.

We then installed fresh top soil to fill up the gap around the sleeper wall and got the garden level ready for the new turf, we then laid the new turf and it transformed the garden.

We also installed new fencing around the garden.

DURING

20141002_142308

We then had to build a frame for the decking to be built off, using 4×2 lengths of wood we built a solid frame, we had to raise it off the ground by a half a meter to get it level with the back door.

BEFORE

20141002_092757This is the start of the job, we started with a blank canvas then built a sleeper wall to retain the top soil where the new lawn will be,