SHINGLE DRIVEWAY

AFTER

driveway 3

Here is the completed job with the shingle levelled on the surface

DURING

driveway 2

After the old driveway was removed we installed a new hard core sub base then used a whacker plate to make it a solid structure ready for the stone.

BEFORE

driveway 1

This is the start of the job, we used a concrete breaker to break up the existing driveway